Nickel HPAL tailings: the unfolding environmental disaster in Indonesia

Without urgent intervention, tailings from nickel HPALs in Indonesia will hit 1.4 billion tonnes by 2035 — enough to cover the whole of Jakarta 1 metre deep.

Without urgent intervention, tailings from nickel HPALs in Indonesia will hit 1.4 billion tonnes by 2035 — enough to cover the whole of Jakarta 1 metre deep.

A decade into nickel downstreaming, Indonesia’s nickel flows remain opaque. Visibility has been very limited on where it actually goes despite hundreds of studies in this field.

In the next ten years, EV and batteries produced in Indonesia will not consume more than 1% of its current domestic nickel production even if..

[Jakarta Post Special Issue] The incoming administration's position on nickel downstreaming will likely remain firm, as stated by the President-elect..

The Energy Shift Institute (Energy Shift) foresees that this year, Indonesia will hold less than 0.4%of global battery manufacturing capacity. In absolute terms, that capacity is just 10GWh out of the more than 2,800GWh the world has in total, not to mention the global figure is set to double by 203